Do I need to be there when you look
at my house? Yes, In
order to provide a thorough evaluation and estimate of your particular needs we will need to have attic access
to evaluate the complete system.

What do I need to do
after signing with you?
Nothing, we handle
it all. Just smile at a job well done when we are through.

How long will my roof
take to complete?
On average from 1-3
days depending on size and pitch.
 

The Weather Stopper Integrated Roofing System has
earned the Good Housekeeping Seal, which means that
Good Housekeeping stands behind the products in this system. |
What about clean up? We do a thorough clean up including gutters
and flowerbeds. We also use a magnetic rake to insure no nails get left behind.

I don't think I have enough ventilation,
should we add ridge vent?
Proper ventilation
is important, however just adding one type or another does not necessarily correct any problems that may exist.
Each type of ventilation has its proper use and a complete evaluation will be necessary to determine your needs.

I think I have rotten wood behind my gutters, can you replace that? Yes, however we may also need to replace the gutters as they are difficult
to remove without damaging them.

Do you offer financing?
Yes, 100% financing
is available on approved credit. |
Do you pull building permits , and
are they required? Yes,
in most municipalities a building permit is required and is included in your bid.

Do you inspect and
replace any rotten wood?
Yes it is very important
to replace bad wood prior to re-roofing.

I heard that 'Ice Shield'
will stop ice damming. Is that correct? No,
Ice shield is an added measure to help prevent and minimize water infiltration caused from ice dams.

How can I prevent
ice dams? Unfortunately there is no way to eliminate
ice damming 100% however by addressing the insulation and ventilation properly you can minimize the chances of
severe ice damming.
Do I need to give you
a large deposit?
In most cases we don't
require a deposit at all. |